Average response time: under 24 hours

Coating failure almost always starts with surface preparation. A two-car garage (about 40 m2) takes one day to prep: clean, patch cracks, abrade with a 30/46 metal-bond disc on a push grinder, industrial vacuum, and apply epoxy resin the same evening. The goal is a CSP 3 profile—uniformly scratched, no glossy patches.
For machine-matched tooling, browse our Husqvarna Redi Lock PCD Diamond Grinding Disc for Ep... range.What causes it.
See the tooling range in our concrete abrading discs category.
Getting prep wrong here shows up later as peeling or delamination.
The details that matter.
Most coating warranties start and end with the surface profile.
Key factors in coating work.
This is the step that decides whether the coating lasts.
A: In short, Yes. New slabs are in most cases troweled even and require a CSP 3 for epoxy resin.
A: The practical answer is, You can, but abrading is more uniform and avoids acid disposal.
A: For most jobs, Wait 7 days for the epoxy resin to fully cure, even if it feels dry.
Looking for the right tool? Check our Triple PCD Husqvarna Diamond Grinding Disc for Epoxy.... Looking for the right tool? Check our Triple PCD with Single Round Segment Diamond Grindin....Prepare the profile, remove every contaminant, and the coating bonds for years. Patch, 30/46 abrade, 120 follow-up, industrial vacuum, and coat the same day.
Written and reviewed by JOY TECH - an SGS & BV audited, CE/RoHS certified diamond tools manufacturer founded in 2004, exporting to 50+ countries.
Our factory and quality management system are audited by SGS and Bureau Veritas. Products meet CE/RoHS requirements and every piece is 100% inspected before packing.
Verified Certificates